1178's new boiler tubes were being cleaned up by some of the team
1178's new boiler tubes were being cleaned up by some of the team
3888x2592
IMG_0104.JPG
The boiler was also receiving a washout
The boiler was also receiving a washout
3888x2592
IMG_0108.JPG
A view inside the boiler from where the front tubeplate would be
A view inside the boiler from where the front tubeplate would be
3888x2592
IMG_0109.JPG
The throatplate was also cleaned up and given a protective coat of paint.
The throatplate was also cleaned up and given a protective coat of paint.
3888x2592
IMG_0112.JPG
Phil was loosening the stud nuts on the boiler.
Phil was loosening the stud nuts on the boiler.
3888x2592
IMG_0117.JPG
Another view of the boiler destined for 1178. This boiler is actually the original boiler from 323 - Bluebell, when it arrived on the railway in 1960.
Another view of the boiler destined for 1178. This boiler is actually the original boiler from 323 - Bluebell, when it arrived on the railway in 1960.
3888x2592
IMG_0132.JPG
Ian and new volunteer Duncan were cleaning up the boiler tubes and adding a protective coat of paint.
Ian and new volunteer Duncan were cleaning up the boiler tubes and adding a protective coat of paint.
3888x2592
IMG_0134.JPG
The boiler is now in the works and work has started on removing foundation ring rivets
The boiler is now in the works and work has started on removing foundation ring rivets
3888x2592
IMG_0137.JPG
The front end of the barrel is also being cleaned up, ready for  it's new tubeplate.
The front end of the barrel is also being cleaned up, ready for it's new tubeplate.
3888x2592
IMG_0138.JPG
Some of the stay heads have been removed as well, as parts of the boiler plate will need replacing.
Some of the stay heads have been removed as well, as parts of the boiler plate will need replacing.
3888x2592
IMG_0140.JPG
The team were split up into pairs, with them working on a side each.
The team were split up into pairs, with them working on a side each.
3888x2592
IMG_0144.JPG
Plenty more work to do yet!
Plenty more work to do yet!
3888x2592
IMG_0145.JPG
Part of the outer firebox has now been removed
Part of the outer firebox has now been removed
3888x2592
IMG_0149.JPG
The lower section of the outer firebox has been removed.
The lower section of the outer firebox has been removed.
3888x2592
IMG_0155.JPG
Another view of the section removed. The section on the other side was removed later in the day.
Another view of the section removed. The section on the other side was removed later in the day.
3888x2592
IMG_0158.JPG
The removed section of plate.
The removed section of plate.
3888x2592
IMG_0159.JPG
Phil working on removing rivets on the other side
Phil working on removing rivets on the other side
3888x2592
IMG_0162.JPG
Phil burning out rivets
Phil burning out rivets
3888x2592
IMG_0168.JPG
The remains of one of the rivets
The remains of one of the rivets
3888x2592
IMG_0169.JPG
Work has begun on removing the stays from the boiler
Work has begun on removing the stays from the boiler
3888x2592
IMG_0299.JPG
This now awaits replacement plate and new stays
This now awaits replacement plate and new stays
3888x2592
IMG_0301.JPG
Some stays could be removed with stilsons so needed to be drilled out
Some stays could be removed with stilsons so needed to be drilled out
3888x2592
IMG_0304.JPG
Stays being drilled out
Stays being drilled out
3888x2592
IMG_0306.JPG
Ian works on burning out the last few rivets on the front plate
Ian works on burning out the last few rivets on the front plate
3072x2304
P1000139.JPG