The boiler is now in the works and work has started on removing foundation ring rivets 3888x2592 IMG_0137.JPG |
The front end of the barrel is also being cleaned up, ready for it's new tubeplate. 3888x2592 IMG_0138.JPG |
Some of the stay heads have been removed as well, as parts of the boiler plate will need replacing. 3888x2592 IMG_0140.JPG |
The team were split up into pairs, with them working on a side each. 3888x2592 IMG_0144.JPG |
Plenty more work to do yet! 3888x2592 IMG_0145.JPG |
Part of the outer firebox has now been removed 3888x2592 IMG_0149.JPG |
The lower section of the outer firebox has been removed. 3888x2592 IMG_0155.JPG |
Another view of the section removed. The section on the other side was removed later in the day. 3888x2592 IMG_0158.JPG |
The removed section of plate. 3888x2592 IMG_0159.JPG |
Phil working on removing rivets on the other side 3888x2592 IMG_0162.JPG |
Phil burning out rivets 3888x2592 IMG_0168.JPG |
The remains of one of the rivets 3888x2592 IMG_0169.JPG |
Work has begun on removing the stays from the boiler 3888x2592 IMG_0299.JPG |
This now awaits replacement plate and new stays 3888x2592 IMG_0301.JPG |
Some stays could be removed with stilsons so needed to be drilled out 3888x2592 IMG_0304.JPG |
Stays being drilled out 3888x2592 IMG_0306.JPG |
Ian works on burning out the last few rivets on the front plate 3072x2304 P1000139.JPG |
One of the rivets being burnt out 3072x2304 P1000146.JPG |
A view of the back and one side of the firebox. Work is progressing on forming the new plate to go on the back. 3072x2304 P1000149.JPG |
A view of the back of the firebox awaiting fitting of a new section of steel plate 3072x2304 P1000151.JPG |
The front plate has now been removed. Duncan is seen here needle gunning the foundation ring. 3072x2304 P1000155.JPG |
The new backplate being trial fitted. It will be cut down to size once we are happy with the fit. 3072x2304 P1000159.JPG |
Another view of the new backplate. Since this photo was taken we have started to form the plate for the front section of the firebox. 3072x2304 P1000161.JPG |
Phil and Ben check what work needs to be done to clean up the edge of the existing plate now it has been cut. 3072x2304 P1000164.JPG |
| | | |