Ian works on burning out the last few rivets on the front plate 3072x2304 P1000139.JPG |
One of the rivets being burnt out 3072x2304 P1000146.JPG |
A view of the back and one side of the firebox. Work is progressing on forming the new plate to go on the back. 3072x2304 P1000149.JPG |
A view of the back of the firebox awaiting fitting of a new section of steel plate 3072x2304 P1000151.JPG |
The front plate has now been removed. Duncan is seen here needle gunning the foundation ring. 3072x2304 P1000155.JPG |
The new backplate being trial fitted. It will be cut down to size once we are happy with the fit. 3072x2304 P1000159.JPG |
Another view of the new backplate. Since this photo was taken we have started to form the plate for the front section of the firebox. 3072x2304 P1000161.JPG |
Phil and Ben check what work needs to be done to clean up the edge of the existing plate now it has been cut. 3072x2304 P1000164.JPG |
Ian and Phil grind down the edge of the cut section of throatplate 3072x2304 P1000183.JPG |
The new front section of the outer firebox trial fitted 3072x2304 P1000187.JPG |
The new section of plate on the front is trial fitted 3072x2304 P1000188.JPG |
A view from the side of the front and back plates being trial fitted 3072x2304 P1000190.JPG |
A view of the new back section. 3072x2304 P1000191.JPG |
A view of the new back section of the outer firebox. These section have been formed using the railways 50 ton hydraulic press. However there is still plenty of work to be done before they can be welding in place. 3072x2304 P1000192.JPG |
Duncan and Ian looking pleased with the days work. 3072x2304 P1000194.JPG |
Ian models the piece of welding rod that acted as a template when forming the curves on the front and back plates. 3072x2304 P1000197.JPG |
Phil starts to heat the corner of the front plate 3072x2304 P1000205.JPG |
The front plate being heat prior to being hammered into the required shape. 3072x2304 P1000206.JPG |
The boiler plate almost ready for hitting 3072x2304 P1000208.JPG |
Duncan and Phil hammering the plate 3072x2304 P1000212.JPG |
A view from above. This shows the inner firebox at the top, then foundation ring and finally at the bottom of the picture, the new plate. This will need the heat treatment several times until it fits tightly against the foundation ring. 3072x2304 P1000216.JPG |
The front plate has now been tack welded in place. Also the central mudhole door has been cut out. 3072x2304 P1000376.JPG |
Another view of the front plate 3072x2304 P1000377.JPG |
The rear plate has now also been welded in place. 3072x2304 P1000378.JPG |
| | | |