British Steam
1178 Restoration
11th November 2007
<-- Back | Showing 37-60 of 104 pictures | Next -->
The front plate has now been removed. Duncan is seen here needle gunning the foundation ring.
The front plate has now been removed. Duncan is seen here needle gunning the foundation ring.
3072x2304
P1000155.JPG
The new backplate being trial fitted. It will be cut down to size once we are happy with the fit.
The new backplate being trial fitted. It will be cut down to size once we are happy with the fit.
3072x2304
P1000159.JPG
Another view of the new backplate. Since this photo was taken we have started to form the plate for the front section of the firebox.
Another view of the new backplate. Since this photo was taken we have started to form the plate for the front section of the firebox.
3072x2304
P1000161.JPG
Phil and Ben check what work needs to be done to clean up the edge of the existing plate now it has been cut.
Phil and Ben check what work needs to be done to clean up the edge of the existing plate now it has been cut.
3072x2304
P1000164.JPG
Ian and Phil grind down the edge of the cut section of throatplate
Ian and Phil grind down the edge of the cut section of throatplate
3072x2304
P1000183.JPG
The new front section of the outer firebox trial fitted
The new front section of the outer firebox trial fitted
3072x2304
P1000187.JPG
The new section of plate on the front is trial fitted
The new section of plate on the front is trial fitted
3072x2304
P1000188.JPG
A view from the side of the front and back plates being trial fitted
A view from the side of the front and back plates being trial fitted
3072x2304
P1000190.JPG
A view of the new back section.
A view of the new back section.
3072x2304
P1000191.JPG
A view of the new back section of the outer firebox. These section have been formed using the railways 50 ton hydraulic press. However there is still plenty of work to be done before they can be welding in place.
A view of the new back section of the outer firebox. These section have been formed using the railways 50 ton hydraulic press. However there is still plenty of work to be done before they can be welding in place.
3072x2304
P1000192.JPG
Duncan and Ian looking pleased with the days work.
Duncan and Ian looking pleased with the days work.
3072x2304
P1000194.JPG
Ian models the piece of welding rod that acted as a template when forming the curves on the front and back plates.
Ian models the piece of welding rod that acted as a template when forming the curves on the front and back plates.
3072x2304
P1000197.JPG
Phil starts to heat the corner of the front plate
Phil starts to heat the corner of the front plate
3072x2304
P1000205.JPG
The front plate being heat prior to being hammered into the required shape.
The front plate being heat prior to being hammered into the required shape.
3072x2304
P1000206.JPG
The boiler plate almost ready for hitting
The boiler plate almost ready for hitting
3072x2304
P1000208.JPG
Duncan and Phil hammering the plate
Duncan and Phil hammering the plate
3072x2304
P1000212.JPG
A view from above. This shows the inner firebox at the top, then foundation ring and finally at the bottom of the picture, the new plate. This will need the heat treatment several times until it fits tightly against the foundation ring.
A view from above. This shows the inner firebox at the top, then foundation ring and finally at the bottom of the picture, the new plate. This will need the heat treatment several times until it fits tightly against the foundation ring.
3072x2304
P1000216.JPG
The front plate has now been tack welded in place. Also the central mudhole door has been cut out.
The front plate has now been tack welded in place. Also the central mudhole door has been cut out.
3072x2304
P1000376.JPG
Another view of the front plate
Another view of the front plate
3072x2304
P1000377.JPG
The rear plate has now also been welded in place.
The rear plate has now also been welded in place.
3072x2304
P1000378.JPG
Phil was working on the patch screws inside the firebox
Phil was working on the patch screws inside the firebox
3072x2304
P1000380.JPG
Dun was drilling out pilot holes for one of the side plates of the outer firebox
Dun was drilling out pilot holes for one of the side plates of the outer firebox
3072x2304
P1000381.JPG
Another view of Duncan's handy work
Another view of Duncan's handy work
3072x2304
P1000382.JPG
The other side plate was being ground down it preparation of fitting to the firebox.
The other side plate was being ground down it preparation of fitting to the firebox.
3072x2304
P1000384.JPG