A view of the new back section of the outer firebox. These section have been formed using the railways 50 ton hydraulic press. However there is still plenty of work to be done before they can be welding in place. 3072x2304 P1000192.JPG |
Duncan and Ian looking pleased with the days work. 3072x2304 P1000194.JPG |
Ian models the piece of welding rod that acted as a template when forming the curves on the front and back plates. 3072x2304 P1000197.JPG |
Phil starts to heat the corner of the front plate 3072x2304 P1000205.JPG |
The front plate being heat prior to being hammered into the required shape. 3072x2304 P1000206.JPG |
The boiler plate almost ready for hitting 3072x2304 P1000208.JPG |
Duncan and Phil hammering the plate 3072x2304 P1000212.JPG |
A view from above. This shows the inner firebox at the top, then foundation ring and finally at the bottom of the picture, the new plate. This will need the heat treatment several times until it fits tightly against the foundation ring. 3072x2304 P1000216.JPG |
The front plate has now been tack welded in place. Also the central mudhole door has been cut out. 3072x2304 P1000376.JPG |
Another view of the front plate 3072x2304 P1000377.JPG |
The rear plate has now also been welded in place. 3072x2304 P1000378.JPG |
Phil was working on the patch screws inside the firebox 3072x2304 P1000380.JPG |
Dun was drilling out pilot holes for one of the side plates of the outer firebox 3072x2304 P1000381.JPG |
Another view of Duncan's handy work 3072x2304 P1000382.JPG |
The other side plate was being ground down it preparation of fitting to the firebox. 3072x2304 P1000384.JPG |
Whilst the boiler is being worked on by paid staff, the gang have been tending to any areas of rust above the frames. 3072x2304 P1000415.JPG |
A view of 'Nettle' looking towards the works. The boiler in front is from the H-Class 3072x2304 P1000416.JPG |
Some of the primer paint had begun to flake. To prevent it from rusting, this was stripped back and fresh primer added/ 3072x2304 P1000417.JPG |
A view of 178 from the front 3072x2304 P1000419.JPG |
The boiler is progressing well. 3072x2304 P1000421.JPG |
Welding work continues and Ben was countersinking the holes for the rivets 3072x2304 P1000422.JPG |
A closeup of on the the new side plates 3072x2304 P1000423.JPG |
A view of the new backplate 3072x2304 P1000425.JPG |
A view of the other side of 178 boiler. 3072x2304 P1000427.JPG |
| | | |