British Steam
1178 Restoration
11th November 2007
<-- Back | Showing 49-72 of 104 pictures | Next -->
Phil starts to heat the corner of the front plate
Phil starts to heat the corner of the front plate
3072x2304
P1000205.JPG
The front plate being heat prior to being hammered into the required shape.
The front plate being heat prior to being hammered into the required shape.
3072x2304
P1000206.JPG
The boiler plate almost ready for hitting
The boiler plate almost ready for hitting
3072x2304
P1000208.JPG
Duncan and Phil hammering the plate
Duncan and Phil hammering the plate
3072x2304
P1000212.JPG
A view from above. This shows the inner firebox at the top, then foundation ring and finally at the bottom of the picture, the new plate. This will need the heat treatment several times until it fits tightly against the foundation ring.
A view from above. This shows the inner firebox at the top, then foundation ring and finally at the bottom of the picture, the new plate. This will need the heat treatment several times until it fits tightly against the foundation ring.
3072x2304
P1000216.JPG
The front plate has now been tack welded in place. Also the central mudhole door has been cut out.
The front plate has now been tack welded in place. Also the central mudhole door has been cut out.
3072x2304
P1000376.JPG
Another view of the front plate
Another view of the front plate
3072x2304
P1000377.JPG
The rear plate has now also been welded in place.
The rear plate has now also been welded in place.
3072x2304
P1000378.JPG
Phil was working on the patch screws inside the firebox
Phil was working on the patch screws inside the firebox
3072x2304
P1000380.JPG
Dun was drilling out pilot holes for one of the side plates of the outer firebox
Dun was drilling out pilot holes for one of the side plates of the outer firebox
3072x2304
P1000381.JPG
Another view of Duncan's handy work
Another view of Duncan's handy work
3072x2304
P1000382.JPG
The other side plate was being ground down it preparation of fitting to the firebox.
The other side plate was being ground down it preparation of fitting to the firebox.
3072x2304
P1000384.JPG
Whilst the boiler is being worked on by paid staff, the gang have been tending to any areas of rust above the frames.
Whilst the boiler is being worked on by paid staff, the gang have been tending to any areas of rust above the frames.
3072x2304
P1000415.JPG
A view of 'Nettle' looking towards the works. The boiler in front is from the H-Class
A view of 'Nettle' looking towards the works. The boiler in front is from the H-Class
3072x2304
P1000416.JPG
Some of the primer paint had begun to flake. To prevent it from rusting, this was stripped back and fresh primer added/
Some of the primer paint had begun to flake. To prevent it from rusting, this was stripped back and fresh primer added/
3072x2304
P1000417.JPG
A view of 178 from the front
A view of 178 from the front
3072x2304
P1000419.JPG
The boiler is progressing well.
The boiler is progressing well.
3072x2304
P1000421.JPG
Welding work continues and Ben was countersinking the holes for the rivets
Welding work continues and Ben was countersinking the holes for the rivets
3072x2304
P1000422.JPG
A closeup of on the the new side plates
A closeup of on the the new side plates
3072x2304
P1000423.JPG
A view of the new backplate
A view of the new backplate
3072x2304
P1000425.JPG
A view of the other side of 178 boiler.
A view of the other side of 178 boiler.
3072x2304
P1000427.JPG
Patch screws are now being added to the inner firebox
Patch screws are now being added to the inner firebox
3072x2304
P1000428.JPG
The backplate has now been rivetted in place
The backplate has now been rivetted in place
3072x2304
P1000431.JPG
A view of the backplate from the outside
A view of the backplate from the outside
3072x2304
P1000432.JPG