Phil was working on the patch screws inside the firebox 3072x2304 P1000380.JPG |
Dun was drilling out pilot holes for one of the side plates of the outer firebox 3072x2304 P1000381.JPG |
Another view of Duncan's handy work 3072x2304 P1000382.JPG |
The other side plate was being ground down it preparation of fitting to the firebox. 3072x2304 P1000384.JPG |
Whilst the boiler is being worked on by paid staff, the gang have been tending to any areas of rust above the frames. 3072x2304 P1000415.JPG |
A view of 'Nettle' looking towards the works. The boiler in front is from the H-Class 3072x2304 P1000416.JPG |
Some of the primer paint had begun to flake. To prevent it from rusting, this was stripped back and fresh primer added/ 3072x2304 P1000417.JPG |
A view of 178 from the front 3072x2304 P1000419.JPG |
The boiler is progressing well. 3072x2304 P1000421.JPG |
Welding work continues and Ben was countersinking the holes for the rivets 3072x2304 P1000422.JPG |
A closeup of on the the new side plates 3072x2304 P1000423.JPG |
A view of the new backplate 3072x2304 P1000425.JPG |
A view of the other side of 178 boiler. 3072x2304 P1000427.JPG |
Patch screws are now being added to the inner firebox 3072x2304 P1000428.JPG |
The backplate has now been rivetted in place 3072x2304 P1000431.JPG |
A view of the backplate from the outside 3072x2304 P1000432.JPG |
Another view of the backplate rivetted into position 3072x2304 P1000433.JPG |
Phil and Duncan drilling in preparation for Stays to be fitted 3072x2304 P1000441.JPG |
The foundation ring has now been rivited to the new sections of plate 3072x2304 P1000442.JPG |
A view of the inner firebox. 3072x2304 P1000445.JPG |
Holes being drilled in prep for stays to be fitted. 3072x2304 P1000448.JPG |
1178 chassis enters the works 3072x2304 P1000477.JPG |
1178 chassis in the works ready to be lifted off it's wheels 3072x2304 P1000480.JPG |
The cab, tanks and wheels had been removed by the end of the day. 3072x2304 P1000484.JPG |
| | | |