Another view of the backplate rivetted into position 3072x2304 P1000433.JPG |
Phil and Duncan drilling in preparation for Stays to be fitted 3072x2304 P1000441.JPG |
The foundation ring has now been rivited to the new sections of plate 3072x2304 P1000442.JPG |
A view of the inner firebox. 3072x2304 P1000445.JPG |
Holes being drilled in prep for stays to be fitted. 3072x2304 P1000448.JPG |
1178 chassis enters the works 3072x2304 P1000477.JPG |
1178 chassis in the works ready to be lifted off it's wheels 3072x2304 P1000480.JPG |
The cab, tanks and wheels had been removed by the end of the day. 3072x2304 P1000484.JPG |
1178 frames sit on a wagon loaned by the P-Way dept. 3072x2304 P1000486.JPG |
1178's wheels await cleaning up and painting in it's new livery 3072x2304 P1000487.JPG |
The frames have started to be painted im 178's new livery. 3072x2304 P1000489.JPG |
The inside of the frames have been painted as well. 3072x2304 P1000492.JPG |
The back of the inside frames are being painted black. 3072x2304 P1000493.JPG |
A view of the 1st coat of paint on the outside of the frames. 3072x2304 P1000495.JPG |
The boiler is progressing well. 3072x2304 P1000498.JPG |
It won't belong before the boiler can be trial fitted in the frames to lineup the tubeplate 3072x2304 P1000499.JPG |
178's frames have now entered the works 3072x2304 P1000501.JPG |
178's new tubeplate 3072x2304 P1000503.JPG |
323 'Bluebell' new tubeplate being drilled out. The tubeplate from 178 was used as a template 3072x2304 P1000504.JPG |
Don't worry, 178 isn't going to be outshopped as Percy. This is just undercoat for it's SECR livery. 3072x2304 P1000510.JPG |
The wheels have received their first coats of undercoat 3072x2304 P1000515.JPG |
The outside of the frames were receiving their top coat. 3072x2304 P1000516.JPG |
The firebox is almost complete. 3072x2304 P1000519.JPG |
The holes for the blowdown valve has been drilled out 3072x2304 P1000520.JPG |
| | | |