592 next to SECR sister loco no 65 2816x2120 DSCF1081.JPG |
A stack of boiler tubes await cutting to length 2816x2120 DSCF1226.JPG |
592's boiler in the works 2816x2120 DSCF1228.JPG |
592's new ash pan 2816x2120 DSCF1230.JPG |
The ash pan awaits completion of the boiler 2816x2120 DSCF1232.JPG |
By the end of the day all the tubes had been cut to length. 2816x2120 DSCF1235.JPG |
The frames and tender are now back in the workshop 2816x2120 DSCF1324.JPG |
Work continues on the spare boiler 2816x2120 DSCF1327.JPG |
592's wheelsets have been removed from the frames 2816x2120 DSCF1329.JPG |
One of many jobs is overhauling the steps if 592. The steps will be reattached at a later date. 2816x2120 DSCF1335.JPG |
Work is progressing on replacing corroded plate work. 2816x2120 DSCF1337.JPG |
The Slide Bars have now been cleaned up 2816x2120 DSCF1389.JPG |
Work Progresses on the boiler 2816x2120 DSCF1391.JPG |
592's frames. In the foreground, tubes are being prepared for fitting in the boiler 2816x2120 DSCF1392.JPG |
Phil working on cleaning some of the motion 2816x2120 DSCF1394.JPG |
The inside of the frames is now receiving it's undercoat and final coat of paint 2816x2120 DSCF1395.JPG |
X Turn rostered crew working on cleaning 592's wheelsets 2816x2120 DSCF1396.JPG |
The inside of the frames have now received their final top coat of paint 2816x2120 DSCF1400.JPG |
Some of the Lubricators were reattached to the frames 2816x2120 DSCF1401.JPG |
The slidebar area had some of it's fittings reattached 2816x2120 DSCF1402.JPG |
The dragbox area was receiving a clean underneath 2816x2120 DSCF1403.JPG |
Dave was working on cleaning and painting some of the brake gear 2816x2120 DSCF1406.JPG |
Tom, Laurence and Ian work on cleaning up the axleboxes 2816x2120 DSCF1435.JPG |
One of the axleboxes cleaned up 2816x2120 DSCF1437.JPG |
| | | |