The boilder steams in front of the works
The boilder steams in front of the works
2816x2120
DSCF1767.JPG
Success!
Success!
2816x2120
DSCF1768.JPG
Just under 100 PSI was produced
Just under 100 PSI was produced
2816x2120
DSCF1770.JPG
The class 08 prepares to shunt into the C Class Tender in order to check for leaks
The class 08 prepares to shunt into the C Class Tender in order to check for leaks
2816x2120
DSCF1775.JPG
A 'Gentle' push sends the tender on it's way!
A 'Gentle' push sends the tender on it's way!
2816x2120
DSCF1776.JPG
Going....
Going....
2816x2120
DSCF1777.JPG
Going...
Going...
2816x2120
DSCF1778.JPG
Going....
Going....
2816x2120
DSCF1779.JPG
Gone!
Gone!
2816x2120
DSCF1780.JPG
Was that meant to leak??? The Class tender is drained after being tested for leaks.
Was that meant to leak??? The Class tender is drained after being tested for leaks.
2816x2120
DSCF1782.JPG
Work has now started on preparing the tender for painting
Work has now started on preparing the tender for painting
2816x2120
DSCF1785.JPG
One side of the tender is rubbed down
One side of the tender is rubbed down
2816x2120
DSCF1786.JPG
David rubbing down the paint on the C Class tender
David rubbing down the paint on the C Class tender
2816x2120
DSCF1788.JPG
All the axleboxes have now been machined and are ready for when 592 is rewheeled
All the axleboxes have now been machined and are ready for when 592 is rewheeled
2816x2120
DSCF1794.JPG
The frames of 592 have now been lined out
The frames of 592 have now been lined out
2816x2120
DSCF1798.JPG
The other side of the C Class tender was being rubbed down as well
The other side of the C Class tender was being rubbed down as well
2816x2120
DSCF1800.JPG
592's boiler waits in the works for fitting back into the frames. This can be done once 592 has been rewheeled.
592's boiler waits in the works for fitting back into the frames. This can be done once 592 has been rewheeled.
2816x2120
DSCF1802.JPG
Martin has been busy making new seats for 592
Martin has been busy making new seats for 592
1280x960
DSCF1809.JPG
The left handside seat still needs some work done
The left handside seat still needs some work done
1280x960
DSCF1813.JPG
The tender is still being overhauled
The tender is still being overhauled
2816x2120
DSCF1820.JPG
The front end of the tender receives attention
The front end of the tender receives attention
2816x2120
DSCF1823.JPG
The steam reverser is being fitted back to 592
The steam reverser is being fitted back to 592
2816x2120
DSCF1825.JPG
592's bufferbeam is now being painted
592's bufferbeam is now being painted
2816x2120
DSCF1827.JPG
The wheels are now being lined out after they were fitted back in the frames