P1010008.JPG 592 old boiler in the works P1010010.JPG Cab and Smokebox outside the Atlantic Shed P1010013.JPG 592 Rolling Chassis P1010001.JPG 592 minus it's boiler P1010002.JPG 592 minus boiler and cab P1010005.JPG 592 old boiler having it's fittings removed P1000001.JPG The Spare C Class Boiler P1000002.JPG The spare boiler prior to further needle gunning P1000003.JPG The spare boiler prior to further needle gunning P1000004.JPG 592 sitting in Turners siding P1000005.JPG Work continuing in the smokebox P1000006.JPG Work continuing on removing the concrete from the smokebox P1000007.JPG Work Progressing within the smokebox P1000008.JPG Work continuing on removing boiler fittings P1000009.JPG More fittings still to remove P1000010.JPG Most of the concrete has now been removed P1000011.JPG Preaparing the smokebox for lifting P1000012.JPG Preparing the boiler for lifting P1000013.JPG The majority of boiler fittings have now been removed P1000014.JPG Exposed pipework covered up to prevent any objects falling into them DSCF0949.JPG 592 await the day's activities DSCF0951.JPG Wheels coated in degreaser DSCF0953.JPG The inside of the frames get the same treatment DSCF0955.JPG as does the underside of the frames DSCF0959.JPG Once washed off the wheels start to look much better DSCF0963.JPG Cleaning of the underside of the frames DSCF0964.JPG everything gets a good clean! DSCF0965.JPG The spare boiler is now in the works DSCF0968.JPG and being prepared for it's fittings to be added DSCF0969.JPG 592's ashpan DSCF1075.JPG Work continues on the tender DSCF1076.JPG Work involves looking for any holes DSCF1079.JPG The motion has been suspended from a temporary support DSCF1081.JPG 592 next to SECR sister loco no 65 DSCF1226.JPG A stack of boiler tubes await cutting to length DSCF1228.JPG 592's boiler in the works DSCF1230.JPG 592's new ash pan DSCF1232.JPG The ash pan awaits completion of the boiler DSCF1235.JPG By the end of the day all the tubes had been cut to length. DSCF1324.JPG The frames and tender are now back in the workshop DSCF1327.JPG Work continues on the spare boiler DSCF1329.JPG 592's wheelsets have been removed from the frames DSCF1335.JPG One of many jobs is overhauling the steps if 592. The steps will be reattached at a later date. DSCF1337.JPG Work is progressing on replacing corroded plate work. DSCF1389.JPG The Slide Bars have now been cleaned up DSCF1391.JPG Work Progresses on the boiler DSCF1392.JPG 592's frames. In the foreground, tubes are being prepared for fitting in the boiler DSCF1394.JPG Phil working on cleaning some of the motion DSCF1395.JPG The inside of the frames is now receiving it's undercoat and final coat of paint DSCF1396.JPG X Turn rostered crew working on cleaning 592's wheelsets DSCF1406.JPG Dave was working on cleaning and painting some of the brake gear DSCF1400.JPG The inside of the frames have now received their final top coat of paint DSCF1401.JPG Some of the Lubricators were reattached to the frames DSCF1402.JPG The slidebar area had some of it's fittings reattached DSCF1403.JPG The dragbox area was receiving a clean underneath DSCF1435.JPG Tom, Laurence and Ian work on cleaning up the axleboxes DSCF1437.JPG One of the axleboxes cleaned up DSCF1439.JPG Years of grimes is removed DSCF1441.JPG The axlebox trays were also cleaned. DSCF1445.JPG A set of axleboxes before they were cleaned DSCF1447.JPG 592's wheels. These should be shortly off for turning before arriving back mid March DSCF1448.JPG Work should begin on the tender Mid March DSCF1450.JPG Brakegear is now being refitted to the frames DSCF1452.JPG Work on the boiler progresses well DSCF1459.JPG Tom, Ian and Martin discussing the days activities. DSCF1683.JPG The axleboxes were having the white metal removed from them DSCF1685.JPG Ian removing the White Metal. DSCF1686.JPG 2 Axleboxes that have had the white metal removed DSCF1687.JPG Ian cleaning up the edges of the axleboxes DSCF1688.JPG Martin and Laurence were working on cleaning up the front of 592 DSCF1690.JPG Martin and Laurence working on the C Class Tender DSCF1694.JPG Martin was needle gunning parts of the tender DSCF1696.JPG 592's boiler has passed it hydraulic test DSCF1697.JPG Now 592's boiler has passed it's hydraulic test, it has been moved outside DSCF1699.JPG 592's new ashpan DSCF1702.JPG SECR O1 has joined 592 in the works. It's now starting to resemble Ashford!! DSCF1703.JPG The axleboxes have now been remetalled and await machining. This can start once the wheels arrive back DSCF1706.JPG New front bufferbeam under construction DSCF1709.JPG 592 has been placed on a couple of temporary trollies to aid movement within the works. DSCF1711.JPG The boiler cladding has been getting some tlc. DSCF1714.JPG Ian painting the inside of the cladding. DSCF1715.JPG Are you sure that's the right colour??? DSCF1717.JPG One of the buffers being fitted to the new front beam DSCF1721.JPG 592's wheelsets in front of the frames. The tender is now also in the works, receiving attention. DSCF1724.JPG C Class boiler undergoing a low pressure steam test DSCF1725.JPG This is the first time the spare C Class boiler has steamed since the late 70's DSCF1741.JPG Lift Off DSCF1742.JPG Enough steam is produced to lift the safety valves DSCF1743.JPG The safety valves are adjusted DSCF1744.JPG The safety valves for the boiler being adjusted DSCF1761.JPG The spare C Class boiler steams for the first time on the Bluebell DSCF1763.JPG C Class boiler in steam DSCF1767.JPG The boilder steams in front of the works DSCF1768.JPG Success! DSCF1770.JPG Just under 100 PSI was produced DSCF1775.JPG The class 08 prepares to shunt into the C Class Tender in order to check for leaks DSCF1776.JPG A 'Gentle' push sends the tender on it's way! DSCF1777.JPG Going.... DSCF1778.JPG Going... DSCF1779.JPG Going.... DSCF1780.JPG Gone! DSCF1782.JPG Was that meant to leak??? The Class tender is drained after being tested for leaks. DSCF1785.JPG Work has now started on preparing the tender for painting DSCF1786.JPG One side of the tender is rubbed down DSCF1788.JPG David rubbing down the paint on the C Class tender DSCF1794.JPG All the axleboxes have now been machined and are ready for when 592 is rewheeled DSCF1798.JPG The frames of 592 have now been lined out DSCF1800.JPG The other side of the C Class tender was being rubbed down as well DSCF1802.JPG 592's boiler waits in the works for fitting back into the frames. This can be done once 592 has been rewheeled. DSCF1809.JPG Martin has been busy making new seats for 592 DSCF1813.JPG The left handside seat still needs some work done DSCF1820.JPG The tender is still being overhauled DSCF1823.JPG The front end of the tender receives attention DSCF1825.JPG The steam reverser is being fitted back to 592 DSCF1827.JPG 592's bufferbeam is now being painted DSCF1830.JPG The wheels are now being lined out after they were fitted back in the frames DSCF1835.JPG It's in!!! DSCF1837.JPG The boiler has now been lifted into the frames by the workshop staff during last week. DSCF1838.JPG A view of the new smokebox DSCF1846.JPG The new bufferbeam has been lined out. DSCF1848.JPG Yesterday the working group were lagging and cladding the boiler DSCF1849.JPG The cab is now in the works for attention DSCF1857.JPG Sunday saw the boiler cladding being sanded down DSCF1859.JPG New cladding in place around the firebox DSCF1862.JPG The smokebox door being prepared DSCF1864.JPG A view of the other side being prepared for painting DSCF1866.JPG 592's cabside plates await painting DSCF1872.JPG A view oinside 592 cab DSCF1878.JPG A glimpse of things to come. The tender awaits lining out DSCF1880.JPG What a finish! DSCF1896.JPG 592 during her steam test DSCF1915.JPG 592 under going intial running in trials DSCF1943.JPG 592 sit's in Sheffield Park station. Note: 592 only backed onto the train to allow another train to enter the station. No loaded test runs have commenced yet. DSCF1883.JPG 592 await's the days activities DSCF1888.JPG 592's spare boiler reaches full pressure DSCF1891.JPG 592 during it's boiler test DSCF1894.JPG 592 in the yard during it's boiler test DSCF1901.JPG 592 blows off at 160 psi DSCF1910.JPG Martin had the honour of being the fireman for the day DSCF1913.JPG Russ beside 592 in Sheffield Park station DSCF1916.JPG 592 stands in Sheffield Park station DSCF1922.JPG 592 awaits the return of SECR 01 from Horsted Keynes DSCF1927.JPG The Chatham Twins together in steam again DSCF1934.JPG 592 waits at Sheffield Park DSCF1941.JPG 592 sit's in Sheffield Park station. Note: 592 only backed onto the train to allow another train to enter the station. No loaded test runs have commenced yet. DSCF1945.JPG 592 in the evening sun.